Measure P is making our City a healthier and more fun place to live!
Measure P funds a multitude of much-needed upgrades and repairs for City-wide parks, fields and sports courts. Projects include the resurfacing of 38 courts, adding energy and water efficient upgrades, and construction of ADA access at walkways.
The following park projects are planned or underway using Measure P funds. Future Measure P park projects throughout Chula Vista will include smart irrigation controls and park amenity replacements, such as barbecue grills, park benches, picnic tables and exterior park lights. Click here to zoom in to see a park, field or court near you on the Measure P interactive map.
All Seasons Park, 1825 Magdalena Avenue
- Basketball Court Resurfacing (Full Court) – Complete
Bay Boulevard Park, 285 Bay Boulevard
- Parking Lot Resurfacing and Striping – Complete
- ADA Compliant Pathways – Complete
- Sidewalk Repairs – Complete
- LED Park Lighting – Complete
Breezewood Park, 1091 Breezewood Drive
- Drinking Water Fountain Replacement – Complete
- Playground Equipment Replacement - Complete
Bonita Long Canyon Park, 1745 Coltridge Lane
- Playground Resurfacing – Future
Chula Vista Community Park, 1060 Eastlake Parkway
- Smart Irrigation Controller – Complete
- Sprinkler Head and Nozzle Replacement – Complete
- Playground Equipment Replacement and Resilient Surfacing –Complete
Connoley Park and Holiday Estates I and II
- Connoley Park (1559 Connoley Avenue)
- Basketball Court Resurfacing (Half Court) – Complete
- Playground Equipment (Ages 2 to 5) – In Progress (CDBG Funded)
- Playground Resilient Surfacing – Future
- Holiday Estates I
- Smart Playground Equipment (Ages 2 to 5) – Complete (CDBG Funded)
- ADA Compliant Pathways and Parking Lot Resurfacing and Striping – Complete (CDBG Funded)
- Holiday Estates II
- ADA Compliant Pathways, Parking Lot Resurfacing and Striping, and Picnic Area – Complete (CDBG Funded)
- Shade Structure – Future (CDBG Funded)
Cottonwood Park, 1778 E Palomar Street
- Interior LED Lighting – Complete
Discovery Park, 700 Buena Vista Way
- Drinking Water Fountain Replacement – Complete
- ADA Compliant Pathways and Parking Lot Resurfacing and Striping – Complete
- Roof Replacements for Restroom and Snack Bar Buildings –Complete
- Playground Resurfacing – In Design
Eucalyptus Park/Menzel Baseball Field, 436 C Street
- Basketball Court Resurfacing (Full Court) – Complete
- ADA Compliant Pathways and Parking Lot Resurfacing and Striping – Complete
- Roof Replacement for Restroom Building – Complete
Explorer Park, Rancho Del Rey Parkway and Norella Street
- Basketball Court Resurfacing (Full court) – Complete
- Playground Resurfacing –Complete
Greg Rogers Park, 1189 Oleander Avenue
- Maintenance Shed Roof Replacement – Complete
- ADA Compliant Pathways – Complete
- Drinking Water Fountain Replacement – Complete
- Sprinkler Replacement – Complete
- Smart Irrigation Controllers –Complete
- Maintenance Shed Restroom Replacement – In Progress
Harborside Park, 670 Oxford Street
- Drinking Water Fountain Replacement – Complete
- Basketball Court Resurfacing (Two Full Courts) – Complete
- Playground Resilient Surfacing – Complete
Heritage Park, 1381 East Palomar Street
- Basketball Court Resurfacing (Full Court and Two Half Courts) – Complete
- Drinking Water Fountain Replacement – Complete
- Interior LED Lighting – Complete
Horizon Park, 970 East Palomar Street
- Basketball Court Resurfacing (Full Court) – Complete
- Interior LED Lighting – Complete
Lauderbach Park, 333 Oxford Street
- Park Rehabilitation – Complete
- Interior LED Lighting – Complete
Loma Verde Park – Reinstra/Max Field, 1420 Loma Lane
- Removal of Staircase from Loma Field to Reinstra/Max Field – Complete
- Loma Verde/Max Field Accessibility Study – Complete
Los Niños Park, 150 Teal Street
- Basketball Court Resurfacing (Full Court) – Complete
- ADA Compliant Pathways and Parking Lot Repaving and Striping – Complete
MacKenzie Park, 2775 MacKenzie Creek Road
- Basketball Court Resurfacing (Two full Courts) – Complete
- Drinking Water Fountain Replacement – Complete
- Playground Resurfacing – Future
Marisol Park, 916 Rancho Del Rey Parkway
- Drinking Water Fountain Replacement – Complete
- Tennis Court Resurfacing (Two Courts) – Complete
Memorial Park, 373 Park Way
- Drinking Water Fountain Replacement – Complete
- Playground Equipment Replacement and Resilient Surfacing – Future
Montevalle Park, 840 Duncan Ranch Road
- Tennis Court Resurfacing (Two Courts) – Complete
- Drinking Water Fountain Replacement – Complete
- Solar Panel Installation – Complete (CREBS Funded)
- Interior LED Lighting – Complete
Mount San Miguel Park, 2335 Paseo Veracruz
- Basketball Court Resurfacing (One Full Court) – Complete
- Drinking Water Fountain Replacement – Complete
- Tennis Court Resurfacing (One Court) – Complete
- Solar Panel Installation – Complete (CREBS Funded)
Mountain Hawk Park, 1475 Lake Crest Drive
- Basketball Court Resurfacing (Full Court) – Complete
- Drinking Water Fountain Replacement – Complete
Norman Park, 270 F Street
- Multi-Generational Outdoor Fitness Area (CDBG and General Funds) - Complete
Otay Park, 1613 Albany Avenue
- Interior LED Lighting – Complete
Paseo Del Rey Park, 750 Paseo Del Rey
- Playground Equipment Replacement and Resilient Surfacing – Future
Rohr Park, 4548 Sweetwater Road
- Basketball Court Area – Reconstruction of Courts, Bleachers, Picnic Benches, and Drinking Water Fountain – Complete
- ADA Compliant Picnic Benches –Complete
- ADA Compliant Pathways – Complete
- New Restroom –Complete
- Parking Lot Repaving and Striping – In Design
- Park LED Lighting – Future
Salt Creek Park, 2710 Otay Lakes Road
- Drinking Water Fountain Replacement – Complete
- Solar Panel Installation – Complete (CREBS Funded)
- Interior LED Lighting – Complete
SDG&E Park, 1450 Hilltop Drive
- Basketball Court Resurfacing (Half Court) – Complete
Santa Cora Park, 1356 Santa Cora
- Drinking Water Fountain Replacement – Complete
- Basketball Court Resurfacing (Full Court) – Complete
- Tennis Court Resurfacing (One Court) – Complete
Santa Venetia Park, 1500 Magdalena Avenue
- Drinking Water Fountain Replacement – Complete
- Basketball Court Resurfacing (Two Full Courts) – Complete
Sunbow Park, 500 East Naples Street
- Drinking Water Fountain Replacement – Complete
Sunridge Park, 852 Gold Oak Court
- Basketball Court Resurfacing (Full court) – Complete
Sunset View Park, 1390 South Greensview Drive
- Drinking Water Fountain Replacement – Complete
- Interior LED Lighting – Complete
Terra Nova Park, 450 Hidden Vista Drive
- ADA Compliant Pathways and Parking Lot Repaving and Striping – Complete
- Playground Resurfacing – Future
Valle Lindo Park, 545 Sequoia Street
- Basketball Court Resurfacing (Full Court) – Complete
Veterans Park, 785 East Palomar Street
- Basketball Court Resurfacing (Full Court) – Complete
- Drinking Water Fountain Replacement – Complete
- Interior LED Lighting – Complete
- Pathway LED Lighting –Complete
Voyager Park, 1178 East J Street
- Drinking Water Fountain Replacement – Complete
- ADA Compliant Pathways and Parking Lot Resurfacing and Striping – Complete
Windingwalk Park, 1675 Exploration Falls Drive
- Drinking Water Fountain Replacement – Complete
- Basketball Resurfacing Court (Full Court) – Complete
- Tennis Court Resurfacing (One Court) – Complete
- Interior LED Lighting – Complete
- Pathway LED Lighting –Complete