City of Chula Vista
Home Menu2012 Chula Vista Light Rail Corridor Improvements Project Study Report
The San Diego Association of Governments (SANDAG) has initiated this Project Study Report for The Chula Vista Light Rail Corridor Improvements. The Study will document the analysis of alternatives for grade separating the LRT tracks from the roadway crossings at E Street, H Street and Palomar Street. The three project study locations are shown in Figure 1. Alternatives being considered include elevating the tracks over the roadway; lowering the tracks under the roadway; and in the case of Palomar Street, lowering the roadway under the tracks. Currently the tracks in this area are also used by freight trains. Each of the projects will include an at-grade bypass track for the freight trains to utilize. The 2012 report is summarized at the links below.